top of page

2016 Elgin Drainage Project Job 254803

Client:

City of Elgin

Location:

Eng:

TRC Engineers, Inc.

Phone Number:

Eng Project Manager:

Kim Culp

Phone Number:

(512) 684-3149

Parties Involved:

Lupe Rubio, Guillermo Rubio, Oscar Arreguin

Total Contract Amount: $

357,365.65

Complete Date:

07-03-2017

Description:

The 2016 Drainage Improvements Project – City of Elgin focused on upgrading the stormwater drainage system to improve water flow and reduce flooding along West Brenham Street and Avenue B.
The work included the installation of reinforced concrete box culverts, storm sewer pipes, concrete valley gutters, curb inlets, and V-drains, as well as the construction of new concrete driveways, curbs, and sidewalks. Additional tasks involved grading and excavation, riprap placement, erosion control, traffic management, and stormwater pollution prevention (SWP3) compliance.
This project significantly improved the city’s stormwater infrastructure, increasing drainage efficiency and protecting surrounding neighborhoods from flood damage.

©2025 by Skyblue Utilities Inc.
bottom of page