top of page

Loop 574 Utility Relocation

Client:

City of Waco

Location:

Waco

Eng:

Engineers Services

Phone Number:

(254) 750-5440

Eng Project Manager:

Phone Number:

Parties Involved:

Lupe Rubio, Guillermo Rubio

Total Contract Amount: $

290,141.54

Complete Date:

March 14, 2014

Description:

The Loop 574 Utility Relocation Project for the City of Waco consisted of relocating existing water transmission lines and related infrastructure to accommodate roadway improvements and future city development.
The work included the installation of 24”, 16”, 10”, 8”, and 6” ductile iron and PVC water mains, gate valves, air release valves, fire hydrants, and service connections. It also involved steel casing installation by dry bore, cutting and removal of existing water lines, line plugging and abandonment, and cathodic protection system installation. Additional activities included trench safety, surface restoration with asphalt and concrete, erosion control, and traffic management during construction.

©2025 by Skyblue Utilities Inc.
bottom of page