top of page

SH 29 Water Line Bore

Client:

City of Liberty Hill

Location:

Liberty Hill

Eng:

K.C. Engineering, Inc.

Phone Number:

(512) 515-1950

Eng Project Manager:

Greg Haley

Phone Number:

(830) 693-5635

Parties Involved:

Lupe Rubio, Guillermo Rubio, Oscar Arreguin

Total Contract Amount: $

500,767.44

Complete Date:

December 2014

Description:

The SH 29 Water Line Bore Project for the City of Liberty Hill involved the construction of a new underground water transmission line to improve the city’s potable water distribution and pressure system.
The work included installation of 8” PVC C900 water mains, gate valves, fire hydrants, wet connections, and 18” steel casing pipe installed by boring under State Highway 29. Additional work involved pressure and leakage testing, system sterilization, temporary maintenance of existing utilities, erosion control measures (silt fencing and seeding), and trench safety compliance.

©2025 by Skyblue Utilities Inc.
bottom of page