SH195 Segment 2, 8” Waterline Relocation

Client:

Chisholm Trail SUD

Location:

City of Florence

Eng:

Halff Associates, Inc.

Phone Number:

(512) 942-6232

Eng Project Manager:

Keith Walker

Phone Number:

(254) 793-3103

Parties Involved:

Lupe Rubio, Guillermo Rubio

Total Contract Amount: $

213,095.28

Complete Date:

11/01/2013

Description:

The SH 195 Segment 2 Waterline Relocation Project for the Chisholm Trail Special Utility District consisted of relocating existing water mains and installing new 8-inch PVC C900 water lines to accommodate highway improvements and ensure reliable service.
The work included open-cut and bored installations of 18” steel encasement pipe, wet connections, ductile iron fittings, gate valves, and flush valve assemblies. Additional activities involved trench excavation safety systems, clearing and grubbing, erosion control measures (silt fencing, stabilized entrances, native seeding, and tree protection), and traffic handling during construction.