Central and Eastside Wastewater Collection Project

Client:

City of Ingram

Location:

230 SH 29, Ingram Texas

Eng:

Hewitt Engineering, Inc.

Eng Project Manager:

John Hewitt

Total Contract Amount:

$ 1,004,615.93

Complete Date:

July, 2015

Parties Involved:

Lupe Rubio, Guillermo Rubio, Oscar Arreguin

Description:

The Central and Eastside Wastewater Collection Project for the City of Ingram consisted of the construction of new underground sanitary sewer infrastructure to expand and improve the city’s wastewater system.
The work included the installation of PVC sewer mains ranging from 6" to 12" in diameter, the construction of manholes at varying depths, and service connections to existing systems. The project also involved jack and bore steel casing installations, trench safety measures, flowable fill, and SWPPP and traffic control implementation to ensure environmental and public safety compliance.
This project significantly enhanced the wastewater collection capacity and reliability for the Ingram community, supporting future residential and commercial development.