Elley Lane Water Main
Client:
New Braunfels Utilities
Location:
New Braunfels
Eng:
TRC Engineers, Inc.
Eng Project Manager:
Rosemary Icossipentahur
Total Contract Amount:
$ 180,772.84
Complete Date:
07/22/2013
Parties Involved:
Lupe Rubio, Guillermo Rubio
Description:
The Elley Lane Water Main Improvements Project for New Braunfels Utilities involved the installation of new 8-inch and 12-inch PVC water mains to strengthen and expand the city’s potable water distribution system.
The work included excavation and installation of PVC C900 SDR-14 pipes, ductile iron fittings, gate valves, fire hydrant assemblies, and a pressure reducing valve (PRV) vault. A major component included boring and jacking under Highway 46 using 20-inch steel encasement pipe with spacers and boots. Additional work covered erosion control fencing, rock berms, and site restoration through topsoil placement and revegetation.